Page MenuHomePhabricator

Perfusion DataFit View: Incorrect calculation fo the maximum signal for the Two Step Linear Model
Closed, ResolvedPublic

Description

In the two step linear model, it is assumed in the calculation of the derived parameters that the maximum signal occurs at the change time between the linear segments. This is however only true if the second slope is negative. In this task this is corrected for.

Revisions and Commits